SpeedySolar · permit design software for California
Ground mounts, carports, commercial, three-phase, and solar, battery and EV on one service. Code checks, a plan set that checks itself and the utility package, in seconds. Your engineer seals it in the app.
Bring a job you're working on. We'll run it live with you.
FAIL IC-1 · CEC 705.12(B)
Busbar overloaded: 270 A against a 240 A limit. Seal blocked until it's fixed.
Under 2 s
Solar, battery or EV plan set with every check, measured on a laptop
4 utilities
SCE, PG&E, SDG&E and LADWP packages filled in
Every number
Names the code section and edition behind it
Coverage
| Job | Instant plan-set tools1 | Drafting services2 | SpeedySolar |
|---|---|---|---|
| Pitched-roof home solar | Yes | 1–5 business days | Seconds |
| Ground mount | Not supported | Longer | Seconds |
| Carport | Built for pitched roofs | Days | Seconds |
| Commercial, over 25 kW AC | Not supported | Longer | Seconds |
| Three-phase service | Not supported | Days | Seconds |
| Battery added to existing solar | Not supported | Longer | Seconds |
| Solar + battery + EV, one service | EV chargers not covered | Days | Seconds |
| Equipment not on a list | Listed parts only | Yes | From the data sheet |
1. A leading instant plan-set tool's help page, Nov 2026. 2. A national permit-design service's site, Nov 2026.
One service
One service calculation covers all three. The 120% busbar rule counts the EV breakers, and EV load management, CALGreen charger counts and the utility's EV service application are built in.
When a check fails, it tells you why and what would fix it.
IC-1CEC 705.12(B) · 120% rule
FAIL 270 A > 240 A
Ways to pass
Also included
Type the numbers from the data sheet. There is no supported-products list to wait on.
The PDF is read back: values match across sheets and every sheet is there. What software can't judge is marked MANUAL, never passed.
Each result names the section and edition it applies, so a plan checker's question is already answered on the sheet.
SCE, PG&E, SDG&E and LADWP: single-line, plot plan as PDF and DXF, the utility's checklist and every application field.
Seats, roles and several engineers in one firm account. Plan sets build in the background, so more jobs don't need more drafters.
Engineers record each decision and seal in the app. C-10 and C-46 contractors sign sets for work they install. A failing check blocks the seal.
See it on one of your own jobs.
Who builds it
Omar Radwan, PE
California only. The code edition follows the permit application date.
Your firm's licensed engineer, in the app. Licensed C-10 and C-46 contractors can sign, without a seal, for work they install.
EV charging design is in the web app today. Solar and battery design runs in the SpeedySolar engine and is coming to the web app next. The demo shows both.
Per seat each month, per plan set with prepaid credits, or both. We quote after the demo.
No. SpeedySolar does code, permit and interconnection. It has no 3D roof model, shading, proposals or financing. Keep your sales tool.
Not yet. It screens each job against the structural triggers and flags it for your engineer.
Book a demo
Tell us your firm, your role and the jobs you design. We'll reply with times.
Already a customer? Sign in